image 1
  • About
    • Who we are
    • Our process
    • Where we work
    • Our history
  • Services
    • New Build
    • Facade Restoration & Heritage Works
    • Insurance & Remedial Works
    • Sports Stadia & Estate Refurbishment
    • Private Luxury Builds & Refurbishment
    • Commerical Fit-Out
  • Projects
    • Our work
  • Testimonials
Search

Contact us

  • About
    • Who we are
    • Our process
    • Where we work
    • Our history
  • Services
    • New Build
    • Facade Restoration & Heritage Works
    • Insurance & Remedial Works
    • Sports Stadia & Estate Refurbishment
    • Private Luxury Builds & Refurbishment
    • Commerical Fit-Out
  • Projects
    • Our work
  • Testimonials
Our work

Farlton Road

Swainlands Construction converted a derelict, mid-terrace into two high-quality flats with major structural, drainage, MEP and access-related challenges resolved through coordinated design, strategic logistics and close collaboration with Thames Water.

Click image to enlarge
4
3
Test
Test 2
1
Contract Sum:£400,000
Client:

MVS Developments Ltd

Location:Wandsworth, London
Results:High-quality residential flats, completed and ready for marketing.
Programme:8 Months
Residential Conversion

 

Swainlands Construction were appointed by MVS Developments Ltd to transform a derelict mid-terrace property, containing Category 1 and 2 hazards, into two self-contained flats with side, rear and loft extensions.


The scheme involved asbestos removal, extensive strip-out works, full drainage redesign (below and above ground), groundworks, major structural alterations, including steelwork installation. Works progressed through brickwork, roofing, internal partitions, MEP first and second fix, and full fit-out, including high-quality finishes and landscaping.


Key technical challenges included:


Drainage & MEP Coordination: Careful routing of new above-ground drainage and services to suit revised layouts while minimising impact on ceiling heights through coordinated design with architectural, structural and MEP teams.


Building Over a Mains Sewer: Identified pre-construction and resolved through close collaboration with Thames Water and the design team, delivering a compliant structural solution with concrete-encased steelwork and new inspection chambers.


Restricted Access & Logistics: No rear access or driveway required, strategic planning, parking bay suspensions and the use of compact plant equipment to maintain programme efficiency.

Do you have a project for us?


Contact us

image 2

Head Office
219a North Street
Romford
Essex RM1 4QA

Contact Us
T: (+44) 01708 330640


Follow Us

Copyright © 2022 Swainlands Construction

Site Cookies    Privacy Policy